ELYntegration

Key Info

Basic Information

Partner:
Prof. Dr. Albert Moser
Faculty:
Electrical Engineering and Information Technology
Pillar:
Joint Technology Initiatives
Project duration:
01.09.2015 to 31.08.2018
EU contribution:
1.861.309 euros
 

Title

Grid Integrated Multi Megawatt High Pressure Alkaline Electrolysers for Energy Applications

Concept

The strategic goal of the ELYntegration Project is the design and engineering of a robust, flexible, efficient and cost-competitive single stack Multimegawatt High Pressure Alkaline Water Electrolysis of 4,5 T H2/day capable to provide cutting-edge operational capabilities under highly dynamic power supplies expected in the frame of generation/ transmission/ distribution scenarios integrating high renewable energies (RE) shares.

Participants

  • Fundación Para El Desarrollo De Nuevas Technologías Del Hidrógeno En Aragón, Spain (Coordinator)
  • IHT Industrie Haute Technologie SA, Switzerland
  • Vlaamse Instelling Voor Technologisch Onderzoek N.V., Belgium
  • Fraunhofer-Gesellschaft zur Förderung der Angewandten Forschung e.V., Germany
  • Instrumentación y Componentes S.A., Spain